Close

Call:

091 846703

Address:
GreenTec Ecological Homes Ltd,
Main Street,
Craughwell,
Co. Galway

News

Naturally Insulated Airtight Yoga Space

Images below show a yoga space currently under construction in Kinvara. Walls and Ceilings are Insulated with Sheepswool Insulation then made airtight with a further 50mm sheepwool to service cavity. A ventilation system is also fitted to ensure excellent air quality.

Read More

New Project started Bodyke, Co Clare 15/08/15

Low energy timber frame construction designed by Boyd Cody Architects, Dublin Specification Includes Timber Frame Construction External Douglas Fir Timber Cladding Bauder Green Roof System Polished Concrete (floors, fireplace and counter tops) Nibe Heat Pump HRV Syatem Rational Timber Windows  

Read More

New Project started Athenry, Co. Galway 06/07/15

Low energy block construction designed by MCA Design and project managed by Clarke Construction Design, Loughrea, Co. Galway Specification Includes 200mm Block Cavity Construction High spec insulation to floors walls and roofs Heat Pump TBC HRV Syatem Triple Glazed Windows    

Read More

Passive House Barn started in Inverin 02/04/2014

GreenTec Ecological Homes are to start construction on a Low Energy Barn at Inverin, Co. Galway. The RIAI Architects in charge of the project are Lester Naughton, Moycullen, Co. Galway Twitter Feed #Inverin This Low Energy Barn will consist of the following; Cold Bridge Free Foundation System Timberframe Wall and Roof […]

Read More

Passive House Site started in Spiddal 22/03/2014

GreenTec Ecological Homes are to start construction on a  passive house at Baile Ard, Spiddal, Co. Galway. The RIAI Architects in charge of the project are Helena McElmeel, Merchant’s Road, Co. Galway (web: www.mcelmeel.ie). Twitter Feed #spiddalph This Passive House will consist of the following; 215mm Block on flat with 250mm External […]

Read More