<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Greentec Eco Homes</title>
	<atom:link href="http://www.greentec.ie/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.greentec.ie</link>
	<description>Building with Nature</description>
	<lastBuildDate>Wed, 16 May 2012 20:37:14 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>New site &#8211; Timber Frame Passive House in Kinvara</title>
		<link>http://www.greentec.ie/new-site-passive-house-in-kinvara/</link>
		<comments>http://www.greentec.ie/new-site-passive-house-in-kinvara/#comments</comments>
		<pubDate>Sun, 29 Apr 2012 17:01:54 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1399</guid>
		<description><![CDATA[GreenTec Eco Homes are to start work in the coming days at a site in Kinvara, Co. Galway. The house is being built for QE Homes which are bringing a new standard of Kit Homes to the market. QE Homes were not involved directly in the design of this project but have been instructed to [...]]]></description>
			<content:encoded><![CDATA[<p>GreenTec Eco Homes are to start work in the coming days at a site in Kinvara, Co. Galway. The house is being built for QE Homes which are bringing a new standard of Kit Homes to the market. QE Homes were not involved directly in the design of this project but have been instructed to adopt their Timber Frame system. The project is typically based on being Formaldehyde Free. The Timber Frame is treated with a natural Borate salt and is constructed without using OSB and Plywood which typically contain formaldehyde in the glues. The walls consist of a product called Paneline and Panelvent, which are wood based products and are free from added formaldehyde glues. Internal finishes are all to consist of formaldehyde free products i.e. natural paints.</p>
<p style="text-align: left;"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-04-29-at-18.08.54.png"><img class="aligncenter  wp-image-1404" title="Screen shot 2012-04-29 at 18.08.54" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-04-29-at-18.08.54-300x242.png" alt="" width="400" height="342" /></a></p>
<p style="text-align: left;"><strong><span style="text-decoration: underline;">Specification on the Project</span></strong></p>
<ul>
<li>Ground Floor Insulated with Rockfloor Slabs in a cold bridge foundation system that sits formally on the ground U-value 0.15W/m2k</li>
<li>Wall Build up of 300mm thick thermally broken stud with cellulose insulation, External face to consist of Cement Render Board, Panelvent and internal face consists of Paneline racking board with service cavity U-value 0.13W/m2k.</li>
<li>Roof build up of 400mm thermally broken roof truss with cellulose insulation and service cavity U-value 0.13W/m2k</li>
<li>Airtightness level below 0.6 Ach</li>
<li>Heating will be from Marble Slab electric heaters.</li>
<li>Triple Glazed Alu-clad Unilux Windows.</li>
<li>Paul HRV Unit with Maico PVC Free Ducting</li>
<li>Biorock Non Electric Treatment Unit</li>
<li>Natural Paint Finish throughout</li>
<li>All Joinery product to be solid timer treated with a water based varnish including attic trapdoor.</li>
</ul>
<div></div>
<div style="text-align: center;">
<div id="attachment_1466" class="wp-caption aligncenter" style="width: 310px"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-05-05-at-10.00.19.png"><img class="size-medium wp-image-1466" title="Screen shot 2012-05-05 at 10.00.19" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-05-05-at-10.00.19-300x254.png" alt="" width="300" height="254" /></a><p class="wp-caption-text">Timber Frame Build-up</p></div>
</div>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/new-site-passive-house-in-kinvara/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Construct Ireland Magazine features Spiddal Project</title>
		<link>http://www.greentec.ie/construct-ireland-article-features-spiddal-project/</link>
		<comments>http://www.greentec.ie/construct-ireland-article-features-spiddal-project/#comments</comments>
		<pubDate>Tue, 17 Apr 2012 19:29:32 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1387</guid>
		<description><![CDATA[]]></description>
			<content:encoded><![CDATA[<div id="attachment_1388" class="wp-caption aligncenter" style="width: 220px"><a href="http://www.greentec.ie/wp-content/uploads/CI-i10v5_Spiddal.pdf"><img class="size-medium wp-image-1388 " title="Screen shot 2012-04-17 at 20.26.14" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-04-17-at-20.26.14-210x300.png" alt="" width="210" height="300" /></a><p class="wp-caption-text">Click Image to Download</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/construct-ireland-article-features-spiddal-project/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Low energy build underway at Inverin, Co. Galway</title>
		<link>http://www.greentec.ie/new-low-energy-build-build-underway-at-inverin/</link>
		<comments>http://www.greentec.ie/new-low-energy-build-build-underway-at-inverin/#comments</comments>
		<pubDate>Sat, 18 Feb 2012 17:43:30 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1329</guid>
		<description><![CDATA[GreenTec Ecological Homes are to start construction on a sustainable low energy home at Inverin, Co. Galway. The RIAI Architects in charge of the project are Heffernan &#38; Assoc, Barna, Co. Galway (web: www.haa.ie). Construction is now underway. This Low Energy Home will consist of the following; 150mm floor insulation on standard raft foundation 250mm Pumped Cavity [...]]]></description>
			<content:encoded><![CDATA[<p>GreenTec Ecological Homes are to start construction on a sustainable low energy home at Inverin, Co. Galway. The RIAI Architects in charge of the project are Heffernan &amp; Assoc, Barna, Co. Galway (web: <a href="http://www.haa.ie" target="_blank">www.haa.ie</a>). Construction is now underway.</p>
<p style="text-align: center;"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.36.31.png"><img class="aligncenter size-full wp-image-1336" title="Screen shot 2012-02-18 at 17.36.31" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.36.31.png" alt="" width="800" height="255" /></a><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.36.42.png"><img class="aligncenter size-full wp-image-1337" title="Screen shot 2012-02-18 at 17.36.42" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.36.42.png" alt="" width="751" height="227" /></a><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.36.59.png"><img class="aligncenter size-full wp-image-1338" title="Screen shot 2012-02-18 at 17.36.59" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.36.59.png" alt="" width="774" height="245" /></a><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.37.21.png"><img class="aligncenter size-full wp-image-1339" title="Screen shot 2012-02-18 at 17.37.21" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.37.21.png" alt="" width="773" height="228" /></a></p>
<p>This Low Energy Home will consist of the following;</p>
<ul>
<li>150mm floor insulation on standard raft foundation</li>
<li>250mm Pumped Cavity Wall Construction using Ancon Teplo Basalt non conducting wall ties</li>
<li>400 &#8211; 500mm Pumped  Cellulose Insulation on the flat with 50mm sheeps wool insulation to service cavity</li>
<li>Intello Airtight Membrane with an expected air change result of 0.6 air changes per hour at 50pa</li>
<li>Triple Glazed Windows</li>
<li>Underfloor Heating upstairs and downstairs</li>
<li>Heat Recovery Ventilation</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/new-low-energy-build-build-underway-at-inverin/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Foundation Complete on project 3 Spiddal using 50% Ecocem Cement</title>
		<link>http://www.greentec.ie/contracts-signed-for-construction-of-3rd-house-in-spiddal/</link>
		<comments>http://www.greentec.ie/contracts-signed-for-construction-of-3rd-house-in-spiddal/#comments</comments>
		<pubDate>Fri, 02 Dec 2011 22:59:51 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1287</guid>
		<description><![CDATA[GreenTec Ecological Homes are to start construction of a second dwellinghouse in Spiddal, Co. Galway. The RIAI Architects in charge of the project are Heffernan &#38; Assoc, Barna, Co. Galway (web: www.haa.ie). Construction is to get underway straight away. This Low Energy Home will consist of the following; 150mm floor insulation on standard raft foundation Exact Wall [...]]]></description>
			<content:encoded><![CDATA[<p>GreenTec Ecological Homes are to start construction of a second dwellinghouse in Spiddal, Co. Galway. The RIAI Architects in charge of the project are Heffernan &amp; Assoc, Barna, Co. Galway (web: <a href="http://www.haa.ie" target="_blank">www.haa.ie</a>). Construction is to get underway straight away.</p>
<p style="text-align: center;"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.42.49.png"><img class="aligncenter size-full wp-image-1343" title="Screen shot 2012-02-18 at 17.42.49" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.42.49.png" alt="" width="833" height="261" /></a></p>
<p style="text-align: center;"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.43.04.png"><img class="aligncenter size-full wp-image-1344" title="Screen shot 2012-02-18 at 17.43.04" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2012-02-18-at-17.43.04.png" alt="" width="752" height="261" /></a></p>
<p>This Low Energy Home will consist of the following;</p>
<ul>
<li>150mm floor insulation on standard raft foundation</li>
<li>Exact Wall Build Up (TBA)</li>
<li>225mm Roof Rafter Pumped with Cellulose Insulation 40mm Sheeps Wool Insulation to service cavity</li>
<li>Intello Airtight Membrane with an expected air change result of 0.6 air changes per hour at 50pa</li>
<li>Triple Glazed Alu-Clad Windows</li>
<li>Underfloor Heating upstairs and downstairs</li>
<li>Heat Recovery Ventilation</li>
<li>All Groundworks</li>
</ul>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/contracts-signed-for-construction-of-3rd-house-in-spiddal/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Air changes result for project 2 in Spiddal 0.46 Passive Standard</title>
		<link>http://www.greentec.ie/contracts-signed-for-2nd-house-in-spiddal/</link>
		<comments>http://www.greentec.ie/contracts-signed-for-2nd-house-in-spiddal/#comments</comments>
		<pubDate>Mon, 30 May 2011 09:30:28 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1195</guid>
		<description><![CDATA[GreenTec Ecological Homes are to start construction of a second dwellinghouse in Spiddal, Co. Galway. The RIAI Architects in charge of the project are Heffernan &#38; Assoc, Barna, Co. Galway (web: www.haa.ie). Construction is soon to get underway. This Low Energy Home will consist of the following; 150mm floor insulation on standard raft foundation 250mm Pumped Cavity [...]]]></description>
			<content:encoded><![CDATA[<p>GreenTec Ecological Homes are to start construction of a second dwellinghouse in Spiddal, Co. Galway. The RIAI Architects in charge of the project are Heffernan &amp; Assoc, Barna, Co. Galway (web: <a href="http://www.haa.ie" target="_blank">www.haa.ie</a>). Construction is soon to get underway.</p>
<div id="attachment_1204" class="wp-caption aligncenter" style="width: 310px"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-05-24-at-22.23.25.png"><img class="size-medium wp-image-1204" title="Screen shot 2011-05-24 at 22.23.25" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-05-24-at-22.23.25-300x113.png" alt="" width="300" height="113" /></a><p class="wp-caption-text">Low Energy House Spiddal</p></div>
<p>This Low Energy Home will consist of the following;</p>
<ul>
<li>150mm floor insulation on standard raft foundation</li>
<li>250mm Pumped Cavity Wall Construction using Ancon Teplo Basalt non conducting wall ties</li>
<li>225mm Roof Rafter Pumped with Cellulose Insulation 40mm hemp to service cavity</li>
<li>Intello Airtight Membrane with an expected air change result of 0.6 air changes per hour at 50pa</li>
<li>Triple Glazed Windows</li>
<li>Underfloor Heating upstairs and downstairs</li>
<li>Heat Recovery Ventilation</li>
<li>All Groundworks</li>
</ul>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/contracts-signed-for-2nd-house-in-spiddal/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Loughrea Holiday Cottage completed</title>
		<link>http://www.greentec.ie/contracts-signed-for-low-energy-cottage-in-loughrea/</link>
		<comments>http://www.greentec.ie/contracts-signed-for-low-energy-cottage-in-loughrea/#comments</comments>
		<pubDate>Sat, 21 May 2011 12:47:33 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1181</guid>
		<description><![CDATA[GreenTec Ecological Homes have signed contracts for the construction of a new low energy holiday cottage in Loughrea, Co. Galway. Construction is soon to be underway. This Low Energy Cottage will consist of the following; 150mm floor insulation on standard raft foundation 250mm Pumped Cavity Wall Construction using Ancon Teplo Basalt non conducting wall ties [...]]]></description>
			<content:encoded><![CDATA[<p>GreenTec Ecological Homes have signed contracts for the construction of a new low energy holiday cottage in Loughrea, Co. Galway. Construction is soon to be underway.</p>
<div id="attachment_1184" class="wp-caption aligncenter" style="width: 310px"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-05-21-at-13.44.27.png"><img class="size-medium wp-image-1184" title="Screen shot 2011-05-21 at 13.44.27" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-05-21-at-13.44.27-300x107.png" alt="" width="300" height="107" /></a><p class="wp-caption-text">Low Energy Cottage, Loughrea, Co. Galway</p></div>
<p>This Low Energy Cottage will consist of the following;</p>
<ul>
<li>150mm floor insulation on standard raft foundation</li>
<li>250mm Pumped Cavity Wall Construction using Ancon Teplo Basalt non conducting wall ties</li>
<li>400mm Cellulose Insulation Pumped in Attic</li>
<li>Intello Airtight Membrane with an expected air change result of 0.6 air changes per hour at 50pa</li>
<li>Triple Glazed Windows</li>
<li>Exhaust Air to Air Passive Heat Recovery System linked to wood burning stove.</li>
<li>PHPP to be completed by Passive Developments</li>
<li>All Groundworks</li>
</ul>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/contracts-signed-for-low-energy-cottage-in-loughrea/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Advert in Construct Ireland Nov &#8211; Dec 2011</title>
		<link>http://www.greentec.ie/construct-ireland/</link>
		<comments>http://www.greentec.ie/construct-ireland/#comments</comments>
		<pubDate>Fri, 20 May 2011 14:59:24 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=39</guid>
		<description><![CDATA[]]></description>
			<content:encoded><![CDATA[<div id="attachment_1276" class="wp-caption aligncenter" style="width: 216px"><a href="http://www.greentec.ie/wp-content/uploads/greentec-jj2.jpg"><img class="size-medium wp-image-1276 " title="Screen shot 2011-07-25 at 23.26.11" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-07-25-at-23.26.11-206x300.png" alt="" width="206" height="300" /></a><p class="wp-caption-text">Construct Ireland Advert July - Aug 2011</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/construct-ireland/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Spiddal Dwelling No.1 Completed on Time &amp; Budget</title>
		<link>http://www.greentec.ie/contracts-signed-for-new-dwelling-house-in-spiddal/</link>
		<comments>http://www.greentec.ie/contracts-signed-for-new-dwelling-house-in-spiddal/#comments</comments>
		<pubDate>Tue, 22 Feb 2011 21:16:38 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1040</guid>
		<description><![CDATA[GreenTec Ecological Homes have just signed contracts for the construction of a new dwellinghouse in Spiddal, Co. Galway. The RIAI Architects in charge of the project are Heffernan &#38; Assoc, Barna, Co. Galway (web: www.haa.ie). Construction is underway. This Low Energy Home will consist of the following; 150mm floor insulation on standard raft foundation 250mm Pumped [...]]]></description>
			<content:encoded><![CDATA[<p>GreenTec Ecological Homes have just signed contracts for the construction of a new dwellinghouse in Spiddal, Co. Galway. The RIAI Architects in charge of the project are Heffernan &amp; Assoc, Barna, Co. Galway (web: <a href="http://www.haa.ie" target="_blank">www.haa.ie</a>). Construction is underway.</p>
<div id="attachment_1061" class="wp-caption aligncenter" style="width: 410px"><a href="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-02-22-at-21.35.09.png"><img class="size-large wp-image-1061" title="Screen shot 2011-02-22 at 21.35.09" src="http://www.greentec.ie/wp-content/uploads/Screen-shot-2011-02-22-at-21.35.09-1024x350.png" alt="" width="400" height="136" /></a><p class="wp-caption-text">Spiddal Dwelling House </p></div>
<p>This Low Energy Home will consist of the following;</p>
<ul>
<li>150mm floor insulation on standard raft foundation</li>
<li>250mm Pumped Cavity Wall Construction using Ancon Teplo Basalt non conducting wall ties</li>
<li>225mm Roof Rafter Pumped with Cellulose Insulation 40mm hemp to service cavity</li>
<li>Intello Airtight Membrane with an expected air change result of 0.6 air changes per hour at 50pa</li>
<li>True Windows Triple Glazed Windows</li>
<li>Triple Glazed Velux roof windows</li>
<li>Underfloor Heating upstairs and downstairs powered by Ochsner Heat Pump</li>
<li>BRINK Climate Systems Heat Recovery Ventilation</li>
<li>All Groundworks</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/contracts-signed-for-new-dwelling-house-in-spiddal/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Download GreenTec PDF Brochure</title>
		<link>http://www.greentec.ie/download-brochure/</link>
		<comments>http://www.greentec.ie/download-brochure/#comments</comments>
		<pubDate>Fri, 10 Dec 2010 12:28:34 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1245</guid>
		<description><![CDATA[]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.greentec.ie/wp-content/uploads/Brochure_lowres_v3.pdf"><img src="http://www.greentec.ie/wp-content/uploads/brochure_download_logo_2.jpg"></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/download-brochure/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Condensation Risk Analysis Reports</title>
		<link>http://www.greentec.ie/condensation-risk-analysis/</link>
		<comments>http://www.greentec.ie/condensation-risk-analysis/#comments</comments>
		<pubDate>Wed, 08 Dec 2010 20:47:44 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.greentec.ie/?p=1009</guid>
		<description><![CDATA[With increasing levels of insulation, the use of impermeable cladding materials and new methods of construction, can often come increased risk of condensation in buildings. Condensation can give rise to a range of problems from surface staining of internal finishes to long term degradation of the structure. GreenTec Eco Homes carry out a condensation risk [...]]]></description>
			<content:encoded><![CDATA[<p>With increasing levels of insulation, the use of impermeable cladding materials and new methods of construction, can often come increased risk of condensation in buildings. Condensation can give rise to a range of problems from surface staining of internal finishes to long term degradation of the structure. GreenTec Eco Homes carry out a condensation risk analysis report on every build-up we use in our dwelling houses to ensure the best possible risk free performance.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.greentec.ie/condensation-risk-analysis/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

